Plant Ⅱ

Factory II, Shenyang Tiantong Electricity Equipment Co.,Ltd.[STEEP], being well quipped and possessing profound technical forces and advanced test means, functions mostly as a base for transformer and complete equipment assembling and processing, which was formally put into production in 2008. Its product lines include but are not limited to high- and low-voltage switch cabinets, YB pre-intalled substations; dry-type transformers, power transformers, special transformers, power transformer used tanks , and other electrical devices.
 
 Presently, its products have found use in many fields, including but not limited to: electrical system, wind power construction, aviation and aerospace, navigation and ships, metallurgy, iron and steel, coal, textile, pharmaceutical industry, business buildings and hotels, such educational institutions like schools, institutes, colleges, and universities, food processing, municipal facility construction, governmental organs, etc. , thereby all range coverage and application are realized in domestic markets.
 
 

Factory II
 
Administrative Office Building, Factory II
 

         Modern Production Workshop       
       

              Meeting Room, Factory II            
 

江西快三 江西快三 江西快三 江西快三 江西快三 江西快三 江西快三 江西快三 江西快三 江西快三